Delivery & installation

Lead times, install day, access and old building removal.

7 articles →

01

Do you install, or is it DIY?

We install everything — our own trained crews assemble, fit and finish your building. Several of the UK's biggest cabin retailers offer no installation service at all and design purely for DIY self-assembly. If you'd rather self-build one of our kits, that option exists too — but 90%+ of our customers choose full installation.

02

How long does installation take?

Typical garden cabins: 1–4 days on site. Fully finished residential builds with kitchen and bathroom: 1–3 weeks. Customers regularly tell us the speed is what surprises them most — factory precision means everything fits first time.

03

What are your lead times?

Typical lead time from order to installation is 10–12 weeks. Because we manufacture in-house, we're not waiting in a third-party factory queue — you'll get a committed timeline with your order confirmation.

04

What happens on installation day?

A hi-ab truck will deliver your building and all materials. The build team then confirms the exact location of the cabin with you. The team then assembles the structure, fits windows/doors/roof, completes any interior works in your package, walks you through the finished building and aftercare, and leaves the site clean.

05

Do I need to be home during installation?

For the start (site confirmation) and completion (handover walkthrough), yes. In between, our teams work independently.

06

What access do you need for delivery?

Our cabins are delivered using a specialist crane truck. The exact delivery method depends on how close the vehicle can safely access your property.

  • Vehicle access — Ideally, we require approximately 3 metres of clear access for the crane truck to reach the unloading point, such as a driveway, front garden, side access, or other suitable location close to the build site. The closer the truck can get, the quicker and more efficient the delivery.
  • Manual handling to the build site — Once the cabin has been unloaded, our installation team will manually carry the components to the construction area. In most cases, a clear access route of approximately 1 metre wide is sufficient for carrying the individual cabin components.
  • Restricted access — If the truck cannot reach the desired unloading point due to narrow roads, low trees, overhead cables, tight turns, steep slopes, or other obstacles, don't worry. We will assess the site and recommend the most suitable solution. We have extensive experience delivering to challenging locations and can often overcome access restrictions with careful planning.

To help us assess your site, we recommend providing a few photos or a short video showing the driveway, unloading area, and the route from the unloading point to the cabin location.

07

Do you remove my old shed or building?

Yes — old building removal and disposal can be added to your groundworks package.